fbpx

The Windstone Server Move

Home Forums Miscellany Community The Windstone Server Move

Viewing 15 posts - 16 through 30 (of 137 total)
  • Author
    Posts
  • #698395
    Anonymous

      Oh, and as to helpers.. um.. I have a left hand and a right hand!

      #698396
      Starbreeze
      Participant

        one left hand + one right hand + plus 40 servers = how many days work???? 😯

        #698397
        Anonymous

          Oh, the racks won’t take long to setup.

          Wiring the network drops to them is going to be the .. ‘fun’ .. part.

          Already I’m looking at this and thinking I’m going to be pushing my move-in to the 30th.

          #698398
          Starbreeze
          Participant

            I hope you don’t run into any wiring problems. Networks can be a royal pain!!! 👿

            #698399
            Anonymous

              Oh I’m sure it will be a problem. It will be pretty when I’m done, but my fingers will be blistered.

              #698400
              Anonymous

                #698401
                Starbreeze
                Participant

                  Did you do all of that today??? 😯

                  #698402
                  Jasmine
                  Participant

                    Are your fingers raw yet?

                    #698403
                    Anonymous

                      #698404
                      Pegasi1978
                      Participant

                        😯 That is one long power strip!

                        #698405

                        The way he’s holding it, it looks like a guitar neck! 😆

                        #698406
                        siberakh1
                        Participant

                          Try having one go dead and trying to find a backup strip that size after hours! Had one where someone non-IT worked on wiring or something in the floor and set one of the floor tiles down, pinching and, ultimately, severing a power cord to one. Needless to say, I was not amused (took down two racks of servers hard – data, app and dev servers… the dev servers weren’t as crucial). Jury rigged all the smaller power strips I could find and kept the non-crucial stuff down.

                          #698407
                          Starbreeze
                          Participant

                            I think he’s trying to show us that he’s armed with a deadly weapon and isn’t afraid to use it. 😆

                            #698408

                            starbreeze wrote:

                            I think he’s trying to show us that he’s armed with a deadly weapon and isn’t afraid to use it. 😆

                            Probably to fend off all those hugs in the Thank you thread 😆

                            less than a day left please click

                            #698409
                            Anonymous

                              Sitting around waiting for the APC field engineer to arrive. Supposedly at Noon. Was supposed to be at the bank at Noon. 😡

                            Viewing 15 posts - 16 through 30 (of 137 total)
                            • You must be logged in to reply to this topic.