fbpx

The Windstone Server Move

Home Forums Miscellany Community The Windstone Server Move

Viewing 15 posts - 1 through 15 (of 137 total)
  • Author
    Posts
  • #495351
    Anonymous

      #698381
      Anonymous

        On topic thread please. This thread will document the time line for the server move and any changes to the plans, and any pictures I can provide.

        In about 20 minutes a truck is going to pull up with some very heavy, very expensive equipment that will make me the envy of geeks everywhere.

        #698382
        Anonymous

          SO MANY TOYS ARRIVING…

          It’s Christmas here.

          #698383
          Anonymous


            Batteries for UPS

            Battery Rack, UPS and Power Distribution Unit

            One wrench to rule them all

            #698384
            Skigod377
            Participant

              πŸ˜† Are you like a kid in a candy store? πŸ˜†

              #698385
              Purplecat
              Participant

                Oooh! Look at all the boxes! πŸ˜€ πŸ˜€

                #698386
                Anonymous

                  skigod377 wrote:

                  πŸ˜† Are you like a kid in a candy store? πŸ˜†

                  Hells YES.

                  Total 115 boxes and 14 racks.

                  I guesstimate the batteries on that cart weigh about 800 lbs.

                  #698387

                  lol TOYS FOR SNAP YAY

                  not my kind of toys, so I won’t try and take them from you πŸ˜€

                  #698388

                  Yay!!! Lots of toys for Snap and lots and lots of work. πŸ˜† That’s a lot of servers. How many helpers do you have? πŸ˜•

                  #698389

                  Isn’t it nice when fun toys like new racks come in? I’m just glad I didn’t have to help move racks across one of our buildings when they closed down one of the server rooms and consolidated to the main room (there is plenty of room there to grow, so it’s all good. Benefit of working off hours I suppose. Some of the servers are just old monsters! Some of them seriously need to be transferred to something newer and the old ones decommissioned!

                  #698390
                  twindragonsmum
                  Participant

                    starbreeze wrote:

                    Yay!!! Lots of toys for Snap and lots and lots of work. πŸ˜† That’s a lot of servers. How many helpers do you have? πŸ˜•

                    Are there any buttons to push? I’m good at that, just ask my hubby…. πŸ˜†

                    twindragonsmum πŸ˜€

                    tdm

                    #698391
                    Jasmine
                    Participant

                      I’m good at breaking things. πŸ˜† I’ll just stand in the corner and watch.

                      #698392
                      Anonymous

                        Because the HVAC guys are coming tomorrow to move pipes in my room, I’m not going to unpack any of it today. I’m actually going to go home and come in early tomorrow.

                        No buttons (yet) but there’s some 225A breakers in the PDU that require both my hands to lift on.

                        More pictures tomorrow.

                        #698393

                        Something to look forward too!!! πŸ˜‰

                        #698394
                        dragonmedley
                        Participant

                          Hahaha! One wrench to rule them all… I love it!

                          Read my books! Volume 1 and 2 of A Dragon Medley are available now.
                          http://www.sarahjestin.com/mybooks.htm
                          I host the feedback lists, which are maintained by drag0nfeathers.
                          http://www.sarahjestin.com/feedbacklists.htm

                        Viewing 15 posts - 1 through 15 (of 137 total)
                        • You must be logged in to reply to this topic.